Showing posts with label Maine. Show all posts
Showing posts with label Maine. Show all posts

January 21, 2012

The piddling contribution of wind power in New England

ISO New England: Seasonal Claimed Capability (SCC), Jan 2012 report

Total New England Claimed Capability (MW)
Winter (March):  34407.889;  125.964 (0.366%) from WIND
Summer (August):  31766.431;  50.735 (0.160%) from WIND

The SCC of Intermittent Power Resources generator assets are determined using the median of net output from the most recently completed Summer Capability and Winter Capability Periods across the Summer (HE 14-18) and Winter (HE 18-19) Intermittent Reliability Hours, respectively.

The ISO-NE report lists 34 wind-powered generators, only 26 providing any winter and 24 summer capability (two of which because they are still under construction or not yet connected and therefore deleted from the list below).

generatorcapacity (kW)wintersummer
MA:
BARNSTABLE_DPW_ID154520080 (40%)14 (7%)
BARTLETTS OCEAN VIEW FARM WIND25000
BERKSHIRE WIND POWER PROJECT150006988 (46.6%)1704 (11.4%)
CITY OF MEDFORD WIND QF10000
HOLY NAME CC JR SR HIGH SCHOOL60000
HULL WIND TURBINE II1800458 (25.4%)52 (2.3%)
HULL WIND TURBINE U5660180 (27.3%)46 (7.0%)
IPSWICH WIND FARM 11600342 (21.4%)125 (7.8%)
JIMINY PEAK WIND QF150000
MOUNT ST MARY-WRENTHAM MA WIND1004 (4.0%)2 (2.0%)
NATURE'S CLASSROOM WIND QF10000
NM-STONE6006 (1%)0
NOTUS WIND I1650500 (30.3%)187 (11.3%)
OTIS_AF_WIND_TURBINE1500199 (13.3%)125 (8.3%)
OTIS_WT_AFCEE_ID169215001200 (80%)1200 (80%)
PRINCETON WIND FARM PROJECT3000582 (19.4%)157 (52.3%)
RICHEY WOODWORKING WIND QF60000
TEMPLETON WIND TURBINE1650401 (24.3%)74 (4.5%)
TOWN_OF_FALMOUTH_WIND_TURBINE1650133 (8.1%)6 (0.4%)
ME:
BEAVER RIDGE WIND45001240 (27.6%)466 (10.4%)
FOX ISLAND WIND4500159 (3.5%)0
KIBBY WIND POWER13200034590 (26.2%)13375 (10.1%)
ROLLINS WIND PLANT6000020860 (34.8%)6207 (10.3%)
SPRUCE MOUNTAIN WIND 190009000 (47.4%)4500 (23.7%)
STETSON II WIND FARM255006740 (26.4%)2602 (10.2%)
STETSON WIND FARM5700015725 (27.6%)7056 (12.4%)
NH:
LEMPSTER WIND240008518 (35.5%)2457 (10.2%)
RI:
NE ENGRS MIDDLETOWN RI WIND QF10000
PORTSMOUTH ABBEY WIND QF66000
TOWN OF PORTSMOUTH RI WIND QF1500159 (10.6%)178 (11.9%)
VT:
SEARSBURG WIND (listed in Mass.)6600900 (13.6%)202 (3.1%)
SHEFFIELD WIND PLANT4000017000 (42.5%)10000 (25.0%)
TOTAL WIND459420125964 (27.4%)50735 (11.0%)


Note that several of these figures are obviously bogus, with round numbers and summer values an even fraction of the winter value suggesting developer reports rather than actual data, and the 80% claimed capacity for one of the Otis Air Force Base turbines is clearly impossible.

Therefore, the ISO-NE report of 0.37% of its power in winter and 0.16% in summer is an exaggeration of the true situation. That piddling contribution includes the output from nine very large wind energy facilities, all on mountain ridges that used to provide important forested habitat.

(Note that the 42-MW Mars Hill Wind Farm in Maine is not included here, because it is outside of the ISO-NE network. And according to the New England Wind Forum of the U.S. Department of Energy, there are two other large facilities currently under construction — Record Hill Wind Project [50 MW] in Byron and Roxbury, Me. and Kingdom Community Wind [63 MW] in Lowell, Vt. — and five more that have been permitted — Cape Wind [468 MW] and Hoosac Wind Energy Project [30 MW] in Mass., Spruce Mountain [19 MW] in Me., Granite Reliable Power Windpark [99 MW] in N.H., and Georgia Mountain Community Wind [12 MW] in Vt.; the Hoosac and Granite projects are in fact under construction, and the Record Hill project is operating.)

wind power, wind energy, environment, environmentalism

April 2, 2011

Scary stuff

From artist Judy Taylor:


A Cobbler trains his young Apprentice. In the background are scenes from that era.

Child labor was common in Maine. They frequently performed dangerous tasks for long hours.

Young women were often sent to the mills by their families, who could not, or would not, support them.

For the first time, workers were allowed to vote anonymously in 1891.

In 1884, Maine celebrated its first "Labor's Day", a day for the workers to celebrate.

A member of the IWW or "Wobblies" tries to organize the Maine woodsmen.

Scenes from an unsuccessful strike attempt to create better conditions for women workers.

Frances Perkins, FDR's Labor Secretary and untiring labor activist, a Maine Labor icon.

Maine's version of WWII women workers participated as ship-builders.

The International Paper strike of 1986 in Jay, Maine, one that still divides the town.

A figure from the past offers a hammer to workers of the present, who are unsure of its value in a changing world.





human rights

July 19, 2008

Turning wilderness over to development in Maine

Bob Weingarten and Nancy O’Toole of Friends of the Boundary Mountains write in the July 10 Daily Bulldog:

The Maine Legislature created the Land Use Regulation Commission (LURC) in 1971 to serve the people of Maine and act as the authority over 10.4 million acres of unorganized lands, and one of the largest contiguous undeveloped areas in the Northeast. Among LURC’s responsibilities are the promotion of orderly development, and the protection of natural and ecological values.

In 1974, to ensure the protection of fragile and irreplaceable soil and habitat, Maine’s mountainous areas above 2,700 feet were given zoning protection from ecological-damaging development by LURC. That protection stood the test of time until January 2008 when LURC reversed the protection of our mountains.

Now, before us we have the biggest industrial project being approved, by LURC, which will change the western Maine mountains forever. A project so huge it’s difficult to sum up the total environmental impact, but let us provide a brief overview.

LURC is about to give final approval to TransCanada’s Kibby Wind Power Project based on a final design plan that doesn’t have final surveys, core testing completed, or hydrology mapping finished. (Which means add at least 20 percent to the following figures). There will be 47 intermittent and 38 perennial streams impacted by bridgeways and culverts that will divert streams up to 225 feet. For road building and towers, a total of 423.6 acres will permanently be impacted. Another 310 acres will be cleared and changed from forest and wetland to right-of-ways for transmission lines. The estimate for total road length is 30.5 miles, with widths ranging from 25 to 35 feet, and for 21.75 miles a 150-foot wide “right of way” for the kV line. A 60-foot “right-of-way” for the 34.5 kV buried collector system that runs from turbine to turbine, and then moves to overhead poles moving down the slopes and ridges to the substation. There will be new buildings, temporary batch plant that will be producing 700 yds3 of concrete per turbine pad, rock crushers, and at least 20 acres will be filled by the unused rock and dirt from blasting and road construction.

The project will impact many species of Maine. The northern bog lemming is among Maine’s rarest mammals and listed as threatened. The Atlantic Salmon and the Canadian Lynx is listed as endangered and its habitat will be impacted by this development. Five state-listed plants species have been identified in the project through the wetlands that will be impacted by the transmission lines. The accumulation downstream due to unforeseeable erosion from all these disturbances will greatly impact the fish and natural vegetation forever. Over time the culverts will fill with sediment, silt fences washed out and the environmental damage will accelerate in magnitude and increase in intensity. This doesn’t even include the hundreds of migratory birds, bats and raptors that will perish each year as a result of the 400-foot high turbines. ...

The Governor’s Task Force on Wind Power Development is promoting 2,000 MW by 2015 and 3,000 MW by 2020, by establishing an Expedited Review and Permitting Area in Maine, which includes at least one-third of LURC’s jurisdiction. In the unorganized areas a rezoning would not be required and the DEP will assume jurisdiction for permitting on any proposal that goes through an organized area; the expedited process should take only 185 days.

An Executive Order required LURC to draft a Commercial Industrial Development Subdistrict (D-CI) to streamline permitting and do away with rezoning hearings. In the draft there are two full pages of townships and plantations on the expedited wind energy development area. ...

wind power, wind energy, wind turbines, wind farms, environment, environmentalism, human rights, animal rights

June 5, 2008

Wind Turbine Hell

Carol Cowperthwaite or Mars Hill, Maine, writes in the June 5 Waldo County Citizen (via National Wind Watch):

I am a resident of Mars Hill, whose personal life and community life have been severely impacted by the nearby UPC Wind plant.

Here is my story:

My husband and I had moved away from Mars Hill, and our retirement dream was to come back to old friends, peace, quiet and country living. The first year after building our house back here was heaven. The quiet was so complete that we thought we had gone deaf. The wildlife on our lawn was so much fun.

We had heard about the windmills, but when we asked how they would affect us if we bought the land, the town manager told us we wouldn’t even see them, much less hear them because they were going to be on the front of the mountain.

We believed him. That was our biggest mistake. At the time, we had no idea that the town fathers had not even read the application that they had co-signed, nor hired a lawyer to explain it to them. They had no idea what they had agreed to. They believed everything UPC had told them.

The biggest lie of all was that there would be no noise, or you had to be within 500 feet to hear anything. I believe that is still the propaganda.

We had one winter of quiet solitude, then with the spring came giant bulldozers, and cranes took over our mountain. Roads three lanes wide were being cut through the trees. Blasting began. We never knew when they were going to blast. The windows shook and the ledge would land on our lawn because they wouldn’t use mats. The heavy equipment would start up before daylight and go late in the night.

What a shock it was to all of us when they blasted away the whole end of the mountain. The giant scar got bigger and bigger. Then were more huge scars across our beautiful mountain. The whole terrain was being devastated. ... The beauty and the access to the ridges would never be again. ...

The massive white giants started turning and were on line in March 2007. Our lives greatly changed that day. We had been upset over the blasting and the devastation of the mountain and the eyesore, but nothing compared to the noise. As they added more windmills on line, the louder it got.

If we got up in the middle of the night, we couldn’t get back to sleep. We closed the windows, the doors, had the furnace running and the drumming never stopped. On a foggy or snowy day, it was always worse. Our TV flickers with each turn of the blades.

We both spent those winter nights roaming around the house because we couldn’t sleep. Then, the less we slept, the angrier we would become because of the situation. When I went out the front door, a sense of rage would hit me that I have never known before. Even after 30 years of teaching, raising two boys and going through a divorce has never produced the kind of rage I feel when those windmills are pounding.

When our autistic, seizure-prone granddaughter comes to visit, we spend no time outdoors due to the shadowing effects and the strobing effects. The shadowing and strobing red lights are known to induce seizures. My husband and I have both had depression from sleep deprivation and worries about investments of land, etc. Insomnia has become a way of life for me. We are still on medications for these problems.

We are, by nature, outdoor people. Most of our days were spent outdoors with gardening, the dog or just drinking tea on the porch. Now we have to do what we have to and head inside and turn up the TV. We have had no choices. We have had this lifestyle forced on to us.

When they start talking about tax breaks for the townspeople, ours amounted to $151; we have lost our lifestyle forever. The windmill people are paying three to four mills to the town for taxes. We are paying 20 mills. ...

If we had our privacy invaded, been harassed or had trespassers on our land, it would be illegal. Because it is just noise, all we can do is live with it. If you live within two to three miles, I pity you because of the noise. If you live within 50 miles, I pity you because of the eyesore.

One more thing — if you use your ridge for recreational uses that will be gone. We are not allowed on that mountain at all. All access trails are gated or chained, with no trespassing signs everywhere, even along the top of the mountain, just in case someone does get up there. They will tell you it is up to the landowners that they rent from, but that is another lie. Even with signed permission slips from the owners, try to find a way up.

You will have a hard time to fight these because our government receives money. Our state is 100 percent for wind power for bragging rights that Maine is a forerunner in “green” and the Department of Environmental Protection works for the state and its boss is the governor. The DEP added an extra five decibels to the acceptable noise level so UPC would be in compliance to the application. Politics is a hard thing to fight.

But, one thing is for sure! Once they are up and running, no matter what you do, they are not coming down until they fall down, and certainly never in my lifetime.

We are not against wind power but strongly feel turbines have to be placed where the impact is less. They should never be within five miles of a dwelling. Also, money should be put in escrow to remove them when their earning power is gone or they are too expensive to repair. I worry about Maine becoming a windmill bone yard because no small town will ever be able to afford to remove them.

wind power, wind energy, wind turbines, wind farms, environment, environmentalism