After a week of operation, one of the 71 GE 1.5-MW wind turbines in FPL Energy's Weatherford, Okla., wind power facility snapped apart last Friday, May 6. The towers are assembled from 3 sections, and everything above the bottom section is now on the ground in bits. The wind speed at the time was variously reported to have been 12-20 mph.
categories: wind power, wind energy, wind farms, wind turbines