October 29, 2006

National Wind Watch



Also see the videos "Voices of Tug Hill" (from Lewis County, N.Y., site of the Maple Ridge Wind Farm) and "Life Under a Windplant" (from Meyersdale, Pa.).

wind power, wind energy, wind farms

October 28, 2006

County ordinances establishing setbacks and noise limits for industrial wind turbines

Here a a couple of good regulations for large wind turbines, excerpted from the noted county ordinances.

Shawano County (Wisc.) Wind Energy Conversion System Ordinance

5.5.4. Noise Standard: The noise due to WECU [wind energy conversion unit] operations shall not be greater than 5 dBA above the established background noise level for more than five 5 minutes out of any one hour time period as measured per Appendix A.
5.5.5. Low Frequency Noise or Infrasound Noise: No low frequency noise or infrasound noise from wind turbine operations shall be created which causes the noise level both within the project boundary and a one-mile radius beyond the project boundary to exceed the following limits ...
5.5.6. Pure Tone Penalty: In the event audible noise due to wind turbine operations contains a steady pure tone, such as a whine, screech, or hum, the standards for Audible Noise shall be reduced by five (5) dB(A). ...
5.5.9. Operations -- Low Frequency Noise: A WECU that emits impulsive sound below 20 Hz that adversely affects the habitability or use of any existing dwelling unit, hospital, school, library, nursing home, or other sensitive noise receptor shall be deemed unsafe and must be shut down immediately.


Otsego County (Mich.) Zoning Ordinance Concerning Wind Turbine Generators and Anemometer Towers

18.5.3. Setbacks. Each proposed wind turbine generator or anemometer tower shall meet the following applicable setback requirements:
18.5.3.1. Each wind turbine generator shall be set back from any adjoining lot line a distance equal to 2,600 feet. The Planning Commission may reduce this setback to no less than 2,100 feet. The amount of setback relief approved by the Planning Commission will be based on data provided by the applicant and prepared and certified by a registered Professional Engineer licensed in the State of Michigan, who is practicing in his or her area of competency. Such data shall be subject to review by the County's independent, recognized expert.

18.5.3.2. In addition to the above, a wind turbine generator shall, in all cases, be setback from a public or private road right-of-way or easement a minimum distance equal to six times the height of the wind turbine generator tower as defined in this Ordinance.

18.5.3.3. For any newly proposed wind turbine generator or anemometer tower, a "wind access buffer" equal to a minimum of five (5) rotor diameters shall be observed from any existing off-site wind turbine generator tower.

18.5.19.1. Sensitive environmental areas shall have a setback of between 2 to 5 miles and shall be determined by the Otsego County Planning Commission and the Department of Natural Resources.

18.5.19.2. Scenic areas, including parks, highways, recreational areas, and others as determined by the County and Townships, shall have a setback of not less than 1 mile.
18.5.4. Maximum Height. Then maximum wind turbine generator or anemometer tower height from the base to the tip of the blade at its highest point shall not exceed 200 feet. The Planning Commission may approve an increased height for a wind turbine generator tower, not to exceed 260 feet from the base to the tip of the blade, if all of the following conditions are met:
18.5.4.1. The increased height will result in the preservation of a substantial stand of trees, existing land forms or structures that would otherwise be removed to increase wind velocity.

18.5.4.2. The increased height will not result in increased intensity on lighting of the tower due to FAA requirements.
wind power, wind energy, wind farms, wind turbines

Wind company trusts government will ignore environment and community and let them build

Putting the lie to their claim of being "green," Toronto wind power developer Skypower is ignoring the finding of the Quebec Environmental Public Hearing Board (BAPE, from the French) against their 114-tower project in northeastern Quebec near the St. Lawrence river.

According to the CBC, the BAPE "concluded Thursday that the turbines would ruin a picturesque view, threaten the region’s natural and wildlife heritage and threaten the agricultural economy."

Skypower's response was to shrug it off and remind people that the decision is only with the Quebec cabinet, which they are confident to sway with the $350,000,000 investment that the project represents.

wind power, wind energy, wind farms, environment, environmentalism, ecoanarchism

October 26, 2006

Bill McKibben calls for more nuclear power

After an ad hominem dismissal of James Lovelock's opposition to industrial-scale wind power in an upcoming New York Review of Books, Bill McKibben then writes,
we will obviously need new energy sources, and the example of the French success with nuclear power (it generates three quarters of their electricity) means it has to be included in the mix of possibilities, as Jim Hansen recently argued in these pages.
The French, by the way, are getting desperate about the very dangerous radioactive waste that is piling up at all of their nuclear plants. Maybe McKibben, like Lovelock, will offer to have it buried in his back yard.

wind power, wind energy, environment, environmentalism, Vermont

One government, one people, one führer

The National Park Service testified in Maine on the negative impacts that an industrial wind power facility on Redington Mountain would have on the Appalachian Trail.

But President Boosh issued a directive some years ago forbidding federal agencies to get in the way of "alternative energy" projects. The directive also requires that they act to clear the way for such projects, even if it conflicts with their mission, e.g., to protect wilderness and natural beauty.

Pam Underhill, the manager of the Appalachian National Scenic Trail testified: "There is little question that the proposed Redington Wind Farm would have a dramatic impact on the scenic character and recreation setting of this section [of the trail]. ... Spread out across several miles of terrain, these 29 structures -- each 40 stories tall, with constantly rotating 130-foot radius blades -- would become the dominant features of the landscape."

California Representative Darrell Issa wants the Interior Secretary to investigate.

Commenting on Issa's accusations, Underhill said: "The taxpayers pay me to protect the Appalachian Trail."

Issa chairs the House Government Reform Subcommittee on Energy and Resources and plans to hold hearings on local opposition to energy projects and to expose other "lower-level" officials acting against energy company plans.

Speaking of anti-democratic directives, Denmark's Environment Minister has threatened municipalities with one if they don't stop blocking efforts to replace their relatively small turbines with giant new ones. No new turbines have been erected in Denmark since 2004, and the industry is in a panic.

wind power, wind energy, wind farms, wind turbines, environment, environmentalism, Vermont, anarchism, anarchosyndicalism, ecoanarchism

October 17, 2006

Accident: A failure in a wind turbine caused a forest fire in Muros

La Voz de Galicia, 29 September 2006:

A failure in one of the wind turbines owned by the Iberdrola company in the Pedregal Mountains, Esteiro (Muros), resulted in a forest fire that razed a hectare of the mountain. When the flames started, the machine was functioning and the movement of its blades helped scatter sparks about the area, which brought the focus of the fire to an area replanted with pine trees.

Two brigades of the Department of the Environment, forest rangers, and a helicopter extinquished the fire in little time. The wind turbine was left very damaged and it is likely that it will have to be replaced.

wind power, wind energy, wind turbines, environment, environmentalism, Vermont

October 16, 2006

For a fraction of a fraction of a fraction of a fraction of our energy: wind power!

At 20% "penetration," a typical goal (limited by the amount of excess capacity on the system that is free to balance the fluctuating wind load), wind energy would in theory replace only one forty-fifth of our energy.

Electricity accounts for roughly a third of all energy use, 20% wind would be a fifth of that third. (And that fifth requires four times the capacity of that actual output.) And the effective capacity (because of its variability) is yet a third of that output.

Even in theory, then, it is clearly an awfully destructive and expensive "alternative." In reality, it is even worse.

wind power, wind energy, wind farms, environment, environmentalism