April 22, 2008

The really inconvenient truth

From BBC News, April 22:

Opening a UN forum on the global impact of climate change on indigenous peoples, [Evo] Morales said that capitalism should be scrapped if the planet is to be saved from the effects of climate change.

"If we want to save our planet earth, we have a duty to put an end to the capitalist system," he said.

Bolivia's president said unbridled industrial development was responsible for the pillaging of natural resources.

environment, environmentalism, human rights, animal rights

April 20, 2008

Best comment on ABC's disgraceful "debate"

"Such defacing of American values is to be expected, I guess, from a network whose debate moderators refuse to wear flag pins."

--Frank Rich, New York Times, Apr. 20

April 14, 2008

The Fog of War Memory

From "What Have We Learned, If Anything?" by Tony Judt, New York Review of Books, May 1, 2008:

We are slipping down a slope. The sophistic distinctions we draw today in our war on terror -- between the rule of law and “exceptional” circumstances, between citizens (who have rights and legal protections) and noncitizens to whom anything can be done, between normal people and “terrorists,” between “us” and “them” -- are not new. The twentieth century saw them all invoked. They are the selfsame distinctions that licensed the worst horrors of the recent past: internment camps, deportation, torture, and murder -- those very crimes that prompt us to murmur “never again.” So what exactly is it that we think we have learned from the past? Of what possible use is our self-righteous cult of memory and memorials if the United States can build its very own internment camp and torture people there?

Far from escaping the twentieth century, we need, I think, to go back and look a bit more carefully. We need to learn again -- or perhaps for the first time -- how war brutalizes and degrades winners and losers alike and what happens to us when, having heedlessly waged war for no good reason, we are encouraged to inflate and demonize our enemies in order to justify that war’s indefinite continuance. And perhaps, in this protracted electoral season, we could put a question to our aspirant leaders: Daddy (or, as it might be, Mommy), what did you do to prevent the war?

April 4, 2008

Enron's revenge

Senator Patrick Leahy wrote:
... I am firmly committed to reducing our nation's dependency on foreign oil and curbing greenhouse gas emission. That is why I have long supported tax incentives for the solar industry and wind power ...
Reply:

Have you seen any evidence that industrial-scale wind measurably reduces, or even slows the growth of, greenhouse gas emissions? Since the wind doesn't always blow when you need it, and then blows variably, wind turbines can't replace other more reliable sources. And those other sources are forced to run less efficiently, i.e., with more, not less, emissions.

Furthermore, it is boilerplate pablum to mention foreign oil. Less than 3% of our electricity comes from burning oil, and most of that is the sludge left over from refining gasoline.

With such little benefit, and accumulating adverse impacts, industrial wind is a harmful boondoggle: Enron's revenge.

wind power, wind energy, environment, environmentalism, human rights, Vermont

April 2, 2008

Cost, space, safety risk, threats to flora and fauna, noise, aesthetic intrusion, shadow flicker: problems with wind energy

Ton van de Wekken, of KEMA Nederland, an energy systems consultancy, writes in the April 1 Renewable Energy World (excerpts):

The costs of onshore wind ranges from €55–100/MWh, depending on the wind resource. For most locations, though, wind energy is not cost-effective and incentives are a prerequisite to make a wind farm profitable.

Inevitably, offshore wind farms are more expensive to develop than onshore farms – requiring about double the initial investment and double the operational costs – due to the extra costs of construction, transport to site and interconnection.

Initiation and feasibility

... Wind farms require large sites. Depending on the rotor diameter the required mutual separation is 300–500 metres with a similar separation distance from dwellings and commercial buildings to limit noise nuisance and provide a safety zone. Even for a medium-sized wind farm, say 5 × 2 MW machines, a substantial land area is required.

Planning requirements of local authorities

The wind farm site has to meet planning and regulatory requirements. In most countries wind turbines may not rotate above roads, railway tracks and waterways, and a minimum clearance from public infrastructure must be observed such as facilities for transport, storage or processing of hazardous goods, and residential, commercial or public buildings.

In northern countries and countries with a continental climate, specific attention has to be paid to the possibility of icing. Ice developed on rotating rotor blades can be thrown long distances, potentially causing injury and damage and planning authorities and regulatory bodies may require an additional risk analysis if the site is subject to icing.

There may also be a zoning plan that prohibits wind turbines or limits the maximum height of structures. Under such circumstances, the relevant authorities should be approached to investigate the possibility of obtaining permission at the earliest possible stage.

In most European countries wind turbines must also be certified according to the relevant national or international safety standards. Manufacturers have to demonstrate conformance by the production of a valid type-certificate.

For any proposed wind farm the following should be considered:
  • Check municipal zoning plan on competing activities and maximum building height
  • Mutual distance between wind turbines 400 metres
  • There are to be no buildings and as few obstacles as possible within 300–500 metres
  • Authorities or concerned parties may request a risk analysis if other activities are to take place within 400–500 metres of the wind turbines.
Planning procedures and environmental issues

The wind farm must comply with all relevant environmental regulations. This may require a number of studies of, for example, the effects on birds, animals and plant life during the construction and use phases. Key parameters include noise, visual impact and safety, and most planning authorities also demand safety and risk assessment studies.

Wind turbines produce noise, mostly caused by the rotor blades and drive train, and the noise impact of wind turbines on the environment is one of the major planning issues. The distance to nearby residential buildings has to be sufficient to ensure that the noise level at the house front is below the statutory limit. The visual impact of a wind farm is also an important planning consideration. Wind farms require open, often elevated, sites and are consequently highly visible from a distance. Many of the potentially most productive sites are in areas of great natural beauty where planning regulation can be very restrictive. Shadow flickering on dwellings and offices due to the periodic – about once per second – passage of the rotating blades across the sun can be very annoying for the occupants, although it is not regulated by law.

wind power, wind energy, wind turbines, wind farms, environment, environmentalism, human rights

March 31, 2008

Babcock & Brown to sell European wind facilities -- to itself

Hello, Enron!

The Financial Times reports (click on the title of this post) that Australian energy investor Babcock & Brown is hoping to cash in its European wind energy assets.

The likely buyer is Portuguese wind company Enersis, which is jointly owned by Babcock & Brown and Babcock & Brown Wind Partners.

Hmmm.

wind power, wind energy, wind farms

March 27, 2008

Wind farm follies

A couple of recent news items show the folly of industrial wind.

First, a press release from the Major Electricity Users' Group (MEUG) of New Zealand describes how the unreliability of wind energy is costing utilities more on the spot market and requiring more diesel backup.
"[T]he underlying driver of current high spot prices is that water is relatively short because of low seasonal inflows and wind generation has been unreliable. These are the types of renewables the government puts much faith in to achieve its 90% renewables by 2025 target, assisted by a ban on new thermal power stations.

"Yesterday the Te Apiti wind farm had peak generation of approximately 30 MW. Installed wind turbine capacity at Te Apiti is 90 MW. Average wind generation for the whole day from Te Apiti was approximately 12 MW. Just when we need as much supply as possible to cover known outages and hence put pressure on spot prices, wind has been missing.

"Once again the expensive to run government owned Whirinaki power station burning diesel entered the market yesterday. Whirinaki has been used partly for 13 days over the last 5 weeks. If government dictates more wind generation should be built by banning new cheaper gas fired base load power stations, we will need a lot more Whirinaki type plants around New Zealand. The operating costs of Whirinaki are estimated to be in excess of 30 c/kWh so using diesel plants in the future to cover dry years or windless periods will penalise all consumers of electricity.

"The evidence that relying on more renewables rather than a mix of generation types will lead to extreme spot prices and the need for inefficient peaking thermal plant is happening almost everyday with the current prolonged summer weather. Government needs to heed the signs and urgently rethink the proposed ban on thermal generation," concluded Ralph Matthes, Executive Director of the MEUG.
Second, a Mar. 27 news story from the Colorodoan describes the Platte River Power Authority (PRPA)'s maintenance problems with their 10-year-old Vestas turbines. It also shows the sham of renewable energy credits, or "green tags", as a substitute for actual energy, since they cost the PRPA one-fifth what operating their own turbines costs.
Some components on Vestas Wind Systems-manufactured wind turbines at Platte River Power Authority's Medicine Bow Wind Project are failing more than 15 years earlier than expected, according to PRPA.

Since the Medicine Bow, which is in southern Wyoming, went online in 1998, 30 major outages have occurred on the wind farm's nine turbines due to component failure, said John Bleem, PRPA division manager.

Although outages vary, Bleem said repairs have led to turbines being down for as long as three months and costing as much as $100,000 -- paid for by Vestas under its manufacturer warranty set to expire in 2011. ...

"When that warranty expires, then it's treated just like a warranty on a car where we will be responsible for the cost of repairs," Bleem said. "We are negotiating service contracts; and those costs have gone up for repairs and maintenance on the machines, and it will continue to go up with labor rates and parts costs." ...

Historically, PRPA has bolstered its renewable portfolio through the purchase of renewable energy credits, or RECs, that allow it to invest in wind farms owned by others who pay for maintenance and repairs. ...

Although PRPA receives a majority of its renewable energy through RECs, its homegrown Medicine Bow project has been far more costly despite producing less energy.

"We spend two-thirds of our renewable budget on energy and one-third on purchasing RECs," Bleem said. "About 80 percent of our portfolio supply comes from RECs, and 20 percent is coming from energy. So what that tells you is that renewable energy is much more expensive than purchasing RECs."

Nearly five to six times more expensive.

"We pay about 1 cent (per kilowatt-hour) for RECs, and we pay about 5 to 6 cents (per kilowatt-hour) for the wind energy we produce ourselves," Bleem said. ...

PRPA has been negotiating with Vestas to extend its Medicine Bow warranty beyond 2011 with some success, but the final result will likely leave the power authority paying a higher premium and more for repairs to its nine turbines. ...

"There is regular scheduled maintenance," Bleem said. "Lubrication is the major thing as well as some minor components that need replacement like filters, but the biggest concern is unscheduled outages. The unscheduled repairs are what have us concerned the most."
wind power, wind energy, wind turbines, wind farms